Commit Graph

2 Commits

Author SHA1 Message Date
Marco 29ea9fafd8 Phase 4: Mustang EN16931/PDF-A-3 validation in CI
Validate e-invoices / mustang (push) Failing after 1m30s
Adds a Gitea Actions workflow that generates realistic e-invoice fixtures (multi-VAT-rate original invoice, Storno, Gutschrift) and validates them against the reference Mustang validator on every push, catching a broken EN16931 mapping before it reaches production instead of relying on manual spot-checks.
2026-07-23 12:12:51 +00:00
Marco 9336cfd0ba Initial commit: shared invoice/correction-invoice PDF generation
Consolidates code previously hand-duplicated between the einfach-produktiv
frontend and payload backend repos into one canonical implementation,
consumed as a git dependency by both instead of being kept in sync by eye.

While merging the two correction-invoice copies, found and fixed three
real drifts between them:
- variantName was silently dropped in the backend's emailed Stornorechnung/
  Gutschrift, but present in the frontend's re-download copy
- the backend's correction-invoice footer wasn't position:fixed, unlike
  the original invoice and the frontend's copy
- the backend used a numeric date format (03.07.2025) while the original
  invoice and the frontend's copy both used a spelled-out month (03. Juli
  2025) — a re-download didn't visually match what was emailed

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-23 08:33:12 +00:00